top of page
Large-15W-1.jpg

Project Manager Resources

We update this page frequently to ensure you have access to the most recent versions of our materials. Links are added or updated regularly and will be italicized with "NEW" next to the title for your convenience.

 

Be sure to check back often to stay up-to-date with the latest resources!

Image by NordWood Themes

FORMS & TOOLS

A

Accubid Setup Form

 

B

Back Charge Form

​

Baseline

Budget Meeting Prep Checklist

Budget Meeting Prep Checklist - MEP

PM Plan Presentation

Tables - Electrical

Tables - Mechanical

Tables - Plumbing

Template - Electrical

Template - Mechanical

Template - Plumbing

​

Bill of Sale

Billing for Stored Materials Request Email

​

Bluebeam

Construction Tool Sets

Contract Review Tool Kit Download

PDI Profile

​

Budget Adjustment Details Report (Sample)

Busduct Certification Form

​

C

cBOM Release Report (Sample)

Certificate of Insurance (COI) 2025-2026

Check Request Form

Closeout Documents Follow Up Email (Template)

Closeout Documents Letter (Template)

Competent Person Identification Form

Compliance Plans (Sample)

Confined Space Entry Permit

Container Request Form and Guidelines

Coordination Request for Information Letter

Coordination Work Program

​​

D

Daily Report Template

-located in Autodesk

Delay Claim Form (Template)

Delay of Approved Submittal Email (Template)

Delay of Approved Submittal Letter

Dog House Order Form - Mechanical

Draw Letter Email (Template)

Draw Summary Cover Sheet (Sample)

Drug and Alcohol Policy

Duct Drop Order Form - Mechanical

 â€‹

E

Employee Disciplinary Form

Energization Procedure Checklist 

-located in Autodesk

Engineering Kick Off Meeting Agenda

Engineering Work Request

Evaluation and Training Request Form

​

F

Feeder Take-off Verification Form

Field Training Request Form

Fieldwire Issues Report (Sample) 

Final Lien Waiver - Conditional

Final Lien Waiver - Unconditional

Fire Alarm End User Acceptance

Follow Up Re-Submittal Email (Template)

Follow Up Submittal Email (Template)

Foreman Leveling Objectives Checklist

FRM Summary Report (Sample)

 

G

Generator Start Up Form​

​

I

​Initial Walkthrough Checklist

Internal Purchase Order (IPO) Report (Sample)

 

J

Jobsite Checklist

Jobsite Safety Inspection Form

-located in Autodesk

​​​​​​

L

Labor Forecast (Sample)

Labor Tracker Template & Sample

Labor vs. Material KPI Tool

Lien Release Email Template

Lighting Control Kickoff Meeting Agenda

Lighting Control Pre-Rough Meeting Agenda

Lockout/Tagout Activity Logbook

Lockout/Tagout PDI Policy - Bilingual

-located in Autodesk

 â€‹

M

Master Material Purchase Order Agreement

Master Subcontract Agreement â€‹

​

Material Standards

Ductwork

Plumbing

Refrigerant Piping

​

Material Transfer Request Form

Medium Grade Letter Template

Mobilelock Request Form

 â€‹

N

New ITR Vendor Request Form

New Project Introduction (Email Template)

New Project Introduction (Org Chart Template)

New Vendor Request Form

Notice of Delay Letter (Email Version)

​​

O

One Line

One Line Diagram (Sample)

Electrical One Line: Setup and Updating

​

OSHA

OSHA 300A 

OSHA Jobsite Visit Checklist

​

Organizational Chart (Template)

 

P

Panel Schedule (Template)

PCO Log (Sample)

PDI Electrical Room Access Log in Sheet

PDI Letterhead

PDI Sqft Pricing Worksheet

PDI Submittal Footer – With Disclaimer

Performance Review Template - Field Employee

Performance Review Template - Foreman

Permit Check Request Form

Phenolic Label Request Form

Print Request Form

Progress Billing Worksheet (Sample)

Project Budget Report (Sample)

Production Docs Set up in FW Checklist

Project Hand-off Checklist

Project Plan Meeting Agenda - Electrical

Project Plan Meeting Agenda - MEP

 

Proposed Change Order (PCO)

Checklist

Email (Template)

Follow Up Email (Template)

Form

 

Purchase Order Requisition (POR) Form

​

Q

Quality Control Evaluation

Program Overview

Distribution (Garden) 

Distribution (HR, HD, MR)

General

Rough

Safety

Structure

Trim

Trim (Hotel)

 

R

Rectangular Takeoff Form - Mechanical

Rental Equipment Request Form

Request for Notice of Building Dry-In Letter

Request for PDI to Install Moisture Sensitive Material Before Building Dry-In Email

Request to Store Time Sensitive Material Letter

 

Re-submittal

Presentation Letter (Email Version)

Presentation Letter - NYC Projects Only (Email Version)

Section Coversheets (Template)

Section Coversheets - NYC Projects Only (Template)

 

Retainage Reduction Request Email (Template)

Retainage Reduction Request Letter (Template)

Return of Goods Authorization (RGA) Form

​

S

Safety Pre-Task Plan

-located in Autodesk

Scrap Metal Recycling Locations​

Service Project Request Form

Soft Letter (Template)

 

SOV Template

Electrical

Energy

Mechanical

Plumbing - Central Plant

Plumbing - Unit Water Heaters

​

Spanish Conversation Take Home

Staging Report (Sample)

Standard Wire Sizes

​

Stored Material

Affidavit

Invoice

​

Subcontract General Conditions (Sample)

Subcontractor Certificate of Insurance COI (Sample)

​

Submittal

Submittal and Material Procurement Log Template

MEP Template Links

Presentation Letter (Email Version)

Presentation Letter - NYC Projects Only (Email Version)

Table of Contents & Coversheets (Template)

Table of Contents & Coversheets - NYC Projects Only (Template)

Vendor (Template Sample)

​

Sunbelt Rentals 2020 Rate Guide​​​​​

SCRIPTS

A

Accubid 

Change Order Pro Guide​

LiveCount Pro Script

​

APM Roadmap Checklist

​

Autodesk (ACC)

Clear the Path

Creating Issues and Issue Reports in ACC

Data Migration Guide

Electrical WIP Tracker Using Issues

Forms in ACC

Getting Started Checklist

Mechanical WIP

Navigating, Uploading, and Comparing Sheets in ACC

Project Start Resource

Reports in ACC

 

B

Best Practices

Best Practices Shortcut "How to Guide" (Android)

Best Practices Shortcut "How to Guide" (Apple)

​

Bid Process Management (BPM)

BPM Script

​

Billing

AIA Billing Guide

Billing for Stored Materials

Gathering Documents to Bill for Stored Materials

Generating the AR Aging Report in OBIEE

Monthly Billing Quick Reference Guide

SOV Guidelines Document (Including Mobilization Notes)

Textura Directions for Allocating Change Orders

Textura Directions for Monthly Billing

​

Bloodborne Pathogens Policy

​

​Bluebeam

Adding Path To Power Chart in Bluebeam

Bluebeam Keyboard Shortcuts

Completing Take-Offs in Bluebeam

Contract Review Tool Kit Instructions

​

Budget Report

Budget Cheat Sheet

Budgets in the Hub

Making Budget Adjustments

Monthly Budget Update Training Guide

Understanding the Project Budget Report

​

C

cBOM

cBOM in the Hub - Kojo

cBOM in the Hub - Mechanical

Payables in the Hub (AP Holds)

​​​

​​Closeout

Closeout Recap Resource

Project Closeout System

 

​Concur

Booking Travel Through Concur

Creating an Itinerary for Office Employee Travel

​

Contracts

Contract Types Matrix

Design Assist Process

Review Guide

 

​Coordination

Coordination QC Process (QC Apex)​​

​

Corporate Safety Manual

​​​

D

Dropped Object Prevention Plan

​

E

​Egnyte

Cloud Uploads

Folder Structure

Remote Users Desktop Sync

Using Egnyte Applications

Web Browser Collaboration Basics 

 

Electrical Safety Guide

Emergency Action Plan​

Energization Procedure Workflow

​

Energy

EV Charger Commissioning Guide​

​​

Excel Reference Card

 

F

Fall Rescue Plan & Procedures

​

Field Resource Management (the Hub)

Labor Tab Script (FRM, Labor Plan, Labor Curve)​

​

Fixtures in The Hub​​

​​

H

Hand and Foot Injury Prevention Policy

Hand and Foot Injury Prevention Policy - Spanish

Heat & Illness Prevention

Hot Work Operations

​

I

Information to Record in Daily Reports

 

Insights

Accessing the Production Meeting Documents

Drilling to Detail

​​

Insurance

Certificate of Insurance Renewal (COI)

Certificate of Insurance Renewal by Certificate Holder

Stored Materials Certificate of Insurance Renewal

​

Internal RFPs

Internal RFP Script

 

​Invoices

Instruction for Clearing Invoice Exceptions

Payables in the Hub Script (AP Holds)

Viewing Invoices Using DocuClass

 

ITR SOV

Creating the ITR SOV Upload

 

J

Jobsite Hazard Analysis

Jobsite Safety Inspection Form Instructions

Jobsite Safety Signs

Jobsite Theft Protection Best Practices

Jobsite Visit

​

K

Kojo​

cBOM in the Hub - Kojo​

Kojo Office Essentials Training Recording

Kojo Script

Mastering Material Release with Kojo

​

KPI Definitions

​

L

Labor

Labor Buyout Process and RFP Tool

Labor Buyout Process Flowchart

Labor Tab (FRM, Labor Plan, Labor Curve)

Timecard Approval Process 

​

Labor Look Ahead Tips & Tricks

Lighting Package Definitions

 

M

Material Buyout Process Flowchart

Mobilization Notes

​​

N

NECA Manual of Labor Units 2021-2022

​

O

​Openspace

Openspace Reference Guide & Best Practices

Openspace Standard Operating Procedure

Openspace Support Reference Guide

​

Oracle

Adding, Updating, and Deleting Project Team Members in Oracle

Oracle Shortcuts

​

P

PDI Acronym Dictionary

PDI Letterhead

​

Power Design Resources 

PDR and Ops - Roles and Responsibilities

PDR - RFP Guide for Operations

​​

PPE Poster

​

Proposed Change Orders (PCOs)

COM PCO Type Resource

Explaining Material and Labor Pricing

Explaining PCOs Guide

Explaining VDC Guide 

PCO 0 Process and Project Default

PCO Script

Request Review for WD Script

Working with the Change Order Team

 

​Procurement

Procurement Log in The Hub Script

Procurement Log in The Hub Video

​​

Production Meeting Document Guidelines

Project Folder Structure

​

Purchase Orders (POs) & cBOM

Payables in the Hub Script (AP HOLDS)

Updating a PO in the Payables Tab - NEW!

​

Production Trackers 

Production Trackers Resource (One Line, Homerun Tracker,   Clear the Path, and WIP Trackers)

​​

bottom of page